Energy Efficiency Directive (EED)
The EU law that sets the bloc's energy efficiency target and requires energy audits, energy management systems and data centre energy reporting from companies.
Also called: EED recast, Directive (EU) 2023/1791, EU Energy Efficiency Directive, EED III
What it means for reporting teams
The recast Energy Efficiency Directive, Directive (EU) 2023/1791, requires the EU to cut final energy consumption by at least 11.7% by 2030 compared with 2020 projections. Member states had to transpose it by 11 October 2025, so companies meet its duties through national law. Energy consumption, not company size, now decides who must act, so SMEs above the thresholds are covered too.
Enterprises using more than 10 TJ of energy a year on average over the previous three years must carry out an energy audit, the first by 11 October 2026 and then every four years, unless they run an energy management system. Above 85 TJ, an energy management system such as ISO 50001 is required by 11 October 2027. Audited companies draw up an action plan and report it and its implementation in the annual report.
Operators of data centres with at least 500 kW of installed IT power report energy and sustainability data to an EU database each year. Reporting teams need metered energy data by carrier and site, three-year averages and audit records. Energy management and carbon accounting software collects meter data, tracks thresholds and shares figures with CSRD and emissions reporting.
What it asks of companies
| Rule or body | Who it covers | What it asks for |
|---|---|---|
| Energy audits (Article 11) | Enterprises above 10 TJ average annual consumption without an energy management system | First audit by 11 October 2026, then every four years, with an action plan published in the annual report. |
| Energy management systems (Article 11) | Enterprises above 85 TJ average annual consumption | Certified energy management system in place by 11 October 2027. |
| Data centre reporting (Article 12) | Data centres with at least 500 kW installed IT power | Report energy performance and sustainability data to the EU database each year. |
| Transposition | EU member states | National laws by 11 October 2025; detail and timing differ by country. |